Tuesday 10 August 2010

6. Sunday 8th August 2010

An additional day with a small (but beautifully formed) workforce of Ruth, David, Peter and Alan. Bob was in a co-operative mood today so Ruth, Peter and Alan were quickly able to plot the co-ordinates of the significant parts of the structure and the position of the finds, David in the meantime did some final planning.




After partial backfilling © Alan Williams (elevated camera angle thanks to Peter!)

We then set about reinstating the removed stones to their previous positions, a bit like a giant jigsaw puzzle at times. The voids were then filled with soil and any loose soil was swept from the surfaces. Finally a tape "barrier" was placed around the site.

David wrapping the site up © Alan Williams
Alan Williams, UWHG